Fordelerskab LK GV Prefab-10 II
Føj til overvågning, så giver vi besked så snart varen er på lager igen.
Fordelerskab LK GV Prefab-10 II
Description
LK Distribution cabinet GV Prefab is delivered complete with mounted LK Heating circuit distributor RF including couplings for connecting underfloor heating pipes dim 16. The distributor has a shut-off valve mounted on the inlet. On the return, LK OptiFlow Evo II is mounted for flow adjustment and shut-off. For sizes 2 - 8, OptiFlow 2 - 16 l/m is fitted. For sizes 9 - 12, OptiFlow 4 - 36 l/m is used.
ATTENTION! The cabinet is intended for right-hand assembly, i.e. the distributor is connected from the right side of the cabinet, either via the side end or via the cabinet bottom.
- The cabinet has a tight bottom with rubber pipe penetrations. The bottom of the cabinet is equipped with a drain hole, which means that any leakage water is drained to an inspectionable place in accordance with industry practice. The cabinet is made of 1 mm powder-coated sheet steel, RAL 9016.
- The cabinet is intended to be mounted built into the wall or externally on the wall. The minimum rule thickness for installation is 95 mm.
- There are different frame/door solutions for the cabinet, depending on where the cabinet is mounted and what aesthetic requirements are set:
- Frame/door in standard version is made of powder-coated sheet steel, RAL 9016.
- There are two types of frame/door in the standard version, depending on whether the cabinet is mounted inside or outside on an inner wall.
- In the case of external assembly, the cabinet must also be supplemented with a plinth to hide pipes between the cabinet and the floor.
- When installing in a room with a waterproofing layer on the wall, the cabinet must be supplemented with LK Våtzonsluka PRESEAL, which is connected to the wall's waterproofing layer.
- For a discreet / hidden installation of LK's cabinet, you can advantageously use LK Plasterboard door HIDDEN.
- For more information on the respective frame/door, see the product range.
- The cabinet is delivered with dim pipe penetrations. 8–20, pipe penetrations for pipes/empty pipe dim 12–34, bellows sleeve and 1.5 meter empty pipe for drainage, drainage bend with outlet tray, cable entries for room regulation, spray protection and installation instructions. If the supply line in dim 32 (with empty pipe 42) is to be connected, the cabinet must be completed with LK Pipe penetration 32 RiR (RSK 2419595).
- The back of the cabinet is equipped with four pre-assembled M8 nuts that can be used for attachment to the LK Cabinet Stand when you wish to assemble the cabinet before a concrete slab is cast.
- The cabinet's ends are equipped with knockout holes for possible side connection of supply and return line.
- The top of the cabinet has knockout holes for trunking through the cabinet as well as knockout holes for possible cable entries for room regulation.
- For other possible variants and tailor-made cabinet solutions, contact us at LK.
Measure
- Width: 1050 mm
- Height: 710 mm
- Depth: 95 mm